The DBS projects comprise two offshore wind farms, DBS West and DBS East, to be co-located on the Dogger Bank over 100 km off the northeast coast of England.
Combined, the projects will have an estimated installed capacity of 3GW to generate enough electricity to meet the average annual electricity needs of more than 3 million UK homes.*
The projects are a joint venture between project partners, RWE (51%) and Masdar (49%).

Combined installed capacity: ~3GW
Turbine numbers: up to 200 turbines
(up to 100 at DBS West and up to 100 at DBS East)
Distance from shore: over 100km
Equivalent number of homes powered: more than 3 million *
*Calculation based on 2020-2024 five-year rolling average offshore wind sector load factor, assuming typical UK household consumption, based on latest statistics from DUKES (2025) and Ofgem (2026).